Project Description

Stage 1:

  • Preparation of documentation (verification of the facts and detailed photo-documentation) for reassembly

  • Disassembly of electrical parts of the Viking Timber sawing line technology in Ravsmala, Sweden

  • Designation of dismantled elements in accordance with the existing project

  • Cleaning and treatment of dismantled equipment

  • Preparation of dismantled parts for temporary storage and subsequent transportation to Stalowa Wola, Poland

  • Professional assistance in the loading (Sweden) and unloading (Poland) of electrical equipment

  • Development of warehouse and logistics documentation

Stage 2:

  • Installation of sawmill technology moved from Ravsmala (Sweden)

  • Reassembly of sawmill technology HV lines and LV cables

  • Reassembly of sawmill technology measuring and control cables

  • Individual testing and participation in the activation of technology