Project Description

Reconstruction of 400 MW boiler No. 5 – EPC CONTRACT

  • 420 KV block terminal (surge arresters)

  • 30 MVA transformers 5BT01 and 5BT02

  • Generator terminal and nullifier

  • Generator drive system

  • Electronic protection and measurement, MicroSCADA

  • HV block substation

  • LV block substation

  • Subordinate substation at + 6.1 m

  • Subordinate water treatment distributor

  • Subordinate pumping station distributor

  • Grounding and conductors for technological structures

  • Lighting and plug-in technology distributors

  • Sources and DC voltage distributors

  • Diesel generator