Home/Portfolio/

Mochovce Nuclear Power Plant JOB12

Complete implementation of field instrumentation and electrical parts for the 3rd and 4th unit of the NPP Complete delivery, assembly, installation and commissioning of parts of the control and management system and electrical systems for the nuclear island of the NPP, including: Implementation project documentation Accompanying technical and eligibility documentation Engineering activities and collaboration [...]

IKEA INDUSTRY Stalowa Vola, Poland

Stage 1: Preparation of documentation (verification of the facts and detailed photo-documentation) for reassembly Disassembly of electrical parts of the Viking Timber sawing line technology in Ravsmala, Sweden Designation of dismantled elements in accordance with the existing project Cleaning and treatment of dismantled equipment Preparation of dismantled parts for temporary storage and subsequent transportation [...]

Heating Plant Banská Bystrica – Radvaň

Upgrade of dispatching system Dispatching SW modification - replacement of the existing SIMATIC WinCC v5.1 SP2 visualisation with a newer SIMATIC WinCC v7.3 version Establishment of a new communication network in a circular topology Replacement of operator stations Regulation and monitoring of hot water distribution service nodes (7 stations) installed at selected locations of the [...]

ZF Levice

High voltage feeder field for transformers + development of an extended transformer station Supply and assembly of high voltage field Supply and assembly of high voltage cable, terminals and voltage testing Supply and assembly of a bus bar system

MONDI SCP a.s.

Lime furnace replacement Supply and assembly of low voltage switchboards Supply and assembly of cable lines Supply and installation of LV cables

Krompachy Brown Industrial Park

Delivery and assembly of internal electrical installation Supply and installation of lighting Supply and installation of a bus bar system

U.S. STEEL Košice

RECONSTRUCTION OF THE TD4 TURBINE Delivery and installation of internal electrical wiring, cable support systems and equipment connection Delivery and installation of a rotor starter, temperature and pressure sensors, electro-pneumatic servo drivers Delivery and installation of LV switchboards and a control system with Simatic S7 visualisation Visualisation programming Testing and commissioning REPAIR OF ELECTRICAL INSTALLATION [...]

I.D.C. HOLDING, a.s. Bratislava

Sedita Sereď - Increase of electric output in D production hall - supply and assembly of switchboards, transformer station, cable routes for HV and LV cables, installation of HV and LV cables and transformer station

VODOHOSPODÁRSKA VÝSTAVBA, a.s.

Detva Wastewater Treatment Plant - implementation of electrical installations and measuring and control system - design, supply, installation and commissioning. Devínska Nová Ves Wastewater Treatment Plant - implementation of electrical installations in constructed buildings and outdoor lighting. Brezová pod Bradlom Wastewater Treatment Plant - implementation of electrical installations and measuring and control system. Modra [...]

DUSLO, Inc.

List of performed works in the part - I&C and ELE Dismantling 2 x 1000 KVA transformers Supply and assembly of 2 x 630 KVA and 2 x 250 KVA transformers Adjustment of HV fields - replacement of current transformers Setting and testing protections for new transformers Project documentation for reconstruction of field instruments [...]

Continental Matador Púchov

Supply and assembly of electrical equipment (HV switchboards, transformer station, HV transformer) Increase of the T28 transformer station power output

VOLKSWAGEN Bratislava

NEW PRESSING PLANT H7 Complete supply and installation 0,4 KV - Electrical installation and lighting Installation of bus bars and connection S-stations from the HV substation Supply and installation of 22 KV cables entering the S-substation from the HV switchboard. Complete installation of a 2500 A bus bar distribution system NEW PAINT SHOP Supply and installation [...]

Tunnel control simulator

Simulator for tunnel equipment and central control system Simulation of incidents in the tunnel technology 3D video surveillance simulator generating standard traffic flow and incidents Drive-simulator for tunnel maintenance staff

Motorway D1 Dubná Skala – Turany

The following technologies were implemented as part of motorway D1 Dubná Skala - Turany (about 6 km) put into service in 2015: Supply, integration and visualisation of meteorological stations Supply, integration and visualisation of traffic counters Supply of emergency call stands Integration and visualisation of petrol stations Road light signalling Technological nodes CCTV surveillance Computer [...]

Highway R4 Košice – Milhosť

The following technologies were implemented as part of highway R4 Košice - Milhosť West (about 14 km) put into service in 2013: Traffic counters Road light signalling LV power supply of the R4 highway

Motorway D1 Studenec – Beharovce

The following technologies were implemented as part of motorway D1 Studenec - Beharovce (about 3 km) put into service in 2010 and completion of the Beharovce crossroad in 2013: Integration and visualisation of frost signalling Integration and visualisation of traffic counters Integration and visualisation of emergency call stands Variable traffic signs Technological nodes Cutoff signal-circuit [...]

HOLCIM Rohožník, a.s.

Dosing of solid alternative fuels to a heat exchanger system - implementation of electrical installations and CMS Clinker silo - supply and installation of electrical equipment ReduDust project- implementation of electrical installations and CMS

NAFTA, a.s. Suchohrad

COMPLETION OF FIRE SIGNALLING SYSTEMS AND GAS DETECTION SYSTEMS TO INCREASE ZS2 SAFETY Electric fire signalling system Gas detection system Safety control system

IKEA INDUSTRY Malacky

VONKAJŠIE ROZVODY VN/NN Dodávka a montáž VN a NN káblov Dodávka a montáž káblových trás Odborná montáž a pripojenie transformátorov Odborná montáž a pripojenie distribučných NN rozvádzačov Revízie, úradné skúšky, overenia

BUČINA – REAL Zvolen

Dismantling of the existing distribution box and distribution transformer Supply and installation of a new distribution switchboard Supply and installation of a transformer with the same technical parameters, including oil fill Refurbishing of HV parts, addition of lightning arresters, etc. Refurbishing of de-couplers, grounding, HV and LV switches and restoration of paint coating Metrological [...]

LEAF, Levice

Expansion of the plant - PTS 5, MCC 5 and drying plant Kiosk transformer station, LV distribution switchgear with compensation switchboard Electrical installation of heavy current Modernisation of warning light and acoustic signalling system Project description KS01, KS03 and KS04 compressor stations Acoustic signalling Optical signalling Radio transmission of signals [...]

NAFTA Gbely

Completion AND modernisation of gas leak detection system (PDS) and fire detection SYSTEM (EPS) AT a collection site 1 (ZS1). Gas detection system PDS Electric fire signalling system Connection to control systems and data transmission

TOPAZ Piešťany

Modifications and additions to the main RH switchboard Supply and installation of subsidiary switchboards Cable distribution systems in all buildings concerned Supply and installation of 3 x 400 V and 3 x 220 V AC transformers for power transmission, required for powering laser engraving machines Connecting laser engraving machines in a semi-clean room Connecting [...]

Motorway D1 Svinia – Prešov West

The following technologies were implemented as part of motorway D1 Svinia - Prešov West (about 7 km) put into service in 2010: Local dispatching ISD in SSÚD, Petrovany Integration and visualisation of meteorological stations Integration and visualisation of traffic counters Integration and visualisation of emergency call stands Technological nodes Road light signalling CCTV surveillance Security [...]

HANSOL LCD Slovakia, s.r.o. Voderady

Supply and installation of speakers for sound system expansion in new production facilities Connection of power supply and control from a central control system of ventilation fans in new production areas Connection of power supply and control of a new HVAC unit for air conditioning of new production areas Power supply of robotic workstations [...]

SLOVAK TELEKOM, a.s.

Construction and power supply separation of RESI Malacky Construction and power supply separation of RESI Martin Construction and power supply separation of RESI Topoľčany Construction and power supply separation of RESI Zámky ATU Bratislava - Pajštúnska - electric installations Implementation of lLV connections for ATU Galanta, Senica and Trenčín Design and production of switchboards, [...]

KONTI, s.r.o.

KOH-I-NOR production hall, Senec Scania Senec dealer and distribution centre Billa Michalovce. Billa Svit Electrical installations - supply, installation and commissioning

Motorway D1 Važec – Jánovce, section I.

The following technologies were implemented as part of motorway D1 Važec - Jánovce, section I (about 20 km) put into service in 2009: Local dispatching ISD in SSÚD, Mengusovce Integration and visualisation of meteorological stations Integration and visualisation of traffic counters Integration and visualisation of emergency call stands Integration and visualisation of security system Technological [...]

The Bôrik tunnel

PPA CONTROLL, a.s. implemented a complete technological part of the Bôrik tunnel - 2 x 1,000 m as the direct general contractor for the National Motorway Company, Inc. Commissioning in 12/2009 Power supply of the tunnel (2 x 22 KV substation, LV switchboards - power supply of technological equipment, 2 x rotary, 2 x [...]

Motorway D3 Hričovské Podhradie – Žilina (Strážov)

The following technologies were implemented as part of motorway D1 Hričovské Podhradie - Žilina Strážov (about 8.5 km) put into service in 2008: Connecting technology to local dispatching ISD in SSÚD, Predmier Integration and visualisation of meteorological stations Integration and visualisation of traffic counters Integration and visualisation of emergency call stands Sediment integration and [...]

SAMSUNG ELECTRONICS CO.LTD. SOUL KOREA

Production area - U-project TR01 transformer, 22/6.3 kV, 12/14.4 MVA 22 KV supply to the TR01 transformer 6 KV terminal from the TR01 transformer Control and power cables of TR01 transformer Adjustment of protection in the HV switchboard R22.1 field 1,4,5 Adjustment of protection in the HV switchboard R6.1 field No. 4 MTP adjustment [...]

BANG JOO III Šurany

Project documentation Deliveries Assembly and commissioning HV cable relocation 22 KV/0.4 KV HV substation 3150 KVA HV transformers 400/230 V LV substation and compensation switchboards Busbar system Lighting, grounding and lightning rods Supply and installation of subsidiary switchboards Light current distribution system

Motorway D1 Vrtižer – Hričovské Podhradie

The following technologies were implemented as part of motorway D1 Vrtižer - Hričovské Podhradie (about 13 km) put into service in 2007: Local dispatching ISD in SSÚD, Predmier Connecting technology to local dispatching ISD in SSÚD, Predmier Integration and visualisation of meteorological stations Integration and visualisation of traffic counters Integration and visualisation of security [...]

SAMSUNG Voderady

Design, implementation and commissioning of all electrical equipment and electrical distribution systems of the Samsung Voderady production plant as well as field instrumentation for power engineering and production technology: 22 KV supply 22 kV substations and distribution systems Transformers - ZS1 from ABB, MULTIFIN protection type from General Electric. Substation is supplied from 4 [...]

SLOVNAFT, inc.

Chemical water treatment plant in 2007 Retrofit of 1600 A main circuit breakers in the feeder panels of switchboards Replacement of outdated automatic back-jump relay by a programmable automatic machine Reconstruction of preparation and dosing of chemicals and reactor clarifiers Reconstruction of motor Installation Supply of switchboards Engine control using frequency converters Supply and [...]

LEAF Levice production plant

Delivery of electrical equipment and material, installation of electrical equipment and power distribution systems associated with the construction of a 22KV substation and four transformer stations, testing and engineering. Delivery of electrical equipment and material, installation of electrical equipment and main technological distribution systems, testing and engineering.

Motorway D1 Ladce – Sverepec

The following technologies were implemented as part of motorway D1 Ladce - Sverepec (about 9 km) put into service in 12/2005: Connecting technology to local dispatching ISD in SSÚD, Trenčín Integration of meteorological stations Technological nodes Road light signalling Security system integration - Closed TV circuit - centre completion and camera control for the [...]

Motorway D1 Piešťany – Trenčín – Ladce

The following technologies were implemented as part of the modernisation of the motorway Piešťany - Trenčín - Ladce completed in 11/2005 (about 65 kilometres): Local dispatching ISD in SSÚD, Trenčín Integration of meteorological stations Supply of new meteorological stations for Drietoma and Majer Technological nodes - replacement - computer and control technology for ISD Traffic [...]

CALMIT Žirany

Repair of the electrical parts The project included: Development of project implementation documentation Supply and installation of a new 22 KV cabinet switchboard Connection of a new 22 KV switchboard to the existing external HV network Replacement of external surge arresters on outdoor air inlet lines Connecting a new measurement field to the existing [...]

CALMIT Tisovec

Repair of the electrical parts Development of project implementation documentation Supply and installation of a new 22 KV cabinet switchboard - supply, measurement Connection of a new 22 KV switchboard to the existing external HV network Connecting a new measurement field to the existing monitoring system of power consumption Replacing the existing 6 KV [...]

Motorway D3 Čadca – Oščadnica

The following technologies were implemented as part of motorway D3 Čadca - Oščadnica (about 4 km) put into service in 11/2004: ISD connection to CRS Horelica tunnel Integration of meteorological stations into CRS Technological nodes Variable traffic signs Integration and visualisation of SOS report system Integration and visualisation of security system [...]

Motorway D1 Prešov – Budmír

The following technologies were implemented as part of motorway D1 Prešov - Košice (about 19 km) put into service in 12/2004: Local dispatching ISD in SSÚD, Prešov Meteorological stations Technological nodes Variable traffic sign controllers Variable traffic signs Security system - closed TV circuit Integration and visualisation of the existing SOS report system Integration [...]

The Horelica tunnel

PPA CONROLL, Inc. implemented complete technological part of the Horelica tunnel - 600 m as the general contractor for VÁHOSTAV-SK, Inc. Commissioning in 11/2004 Power supply of the tunnel (22 KV substation, LV switchboard - power supply of technological equipment, UPS and diesel generator) Lighting of the main tunnel and the escape tunnel, fire [...]

Production plant Ferplast Nesvady

Complex delivery of electrical installations at the site: Administrative building Canteen and site caretaker's apartment Production hall No. 1 Production hall No. 2 Production hall No. 3 Warehouse Gatehouse 22/0.4 KV transformer station 22 KV distribution system 0.4 KV distribution system Outdoor lighting Telephone connection External and internal light-current distribution systems Structured cabling Measuring [...]

SAMSUNG ELECTRONICS Slovakia

K2 project - new production hall and new technology Preparation of project documentation, supply, installation and commissioning: heavy current distribution system, lighting, grounding, electrical installations, switchboards Switchboards for lighting, emergency lighting, sockets Power supply for air conditioning and light signalling and technology Electrical fire signalling

Motorway D1 Branisko – Fričovce

Motorway D1 Beharovce - Fričovce put into operation in 2003 with a length of about 16 km consists of three sections: 1. Beharovce - Branisko tunnel, 2. Branisko - Široké tunnel, 3. Široké - Fričovce Technological nodes Cut-off signal-circuit controllers Variable traffic signs and road light signalling Meteorological stations Cabling for ISD in the [...]

The Branisko tunnel

PPA CONTROLL, a.s. implemented the following activities in the construction of the tunnel (5 km): Commissioning in 06/2003 Design of CRS project documentation Supply of a central control system (36 control automatic machines) Coordination of suppliers of technological units Design, delivery and assembly of electronics, control elements and communication elements of the traffic control [...]

DongWoo Voderady, Slovensko

22/0, 4 KV, 630 KVA transformer 22 KV Switchboard USM electricity measurement cabinet LV main switchboard 160 KVar compensation switchboard External lighting switchboard Data switchboard Electrical distribution board for computers UPS power supply Electronic fire signalling, including switchboard HV cable connection between a 22 KV switchboard and a transformer Heavy-current distribution systems Light current [...]

SHC Šaľa

Delivery of electrical equipment and material Installation work of electrical distribution system for artificial lighting Operational distribution of heavy current HV, LV and lighting site distribution systems and telephone connection Testing, inspection and engineering of electrical parts Geodetic survey of HV, LV and public lighting electrical distribution systems Project documentation of the actual implementation [...]